<< Back

One Year Maintenance Contract

To stop and prevent the movement of termites from the ground, holes are drilled from inside your premises at the junction of the wall and the floor at an angle of 45 degrees. The holes are drilled along the side of the entire outer wall at approximately 30cm (12”) intervals.

The insecticide is then poured into these holes to soak the masonry. If your premises are on the ground floor, the partition walls are also treated. The drilling operation is not carried out on the partition walls above the ground floor because the RCC slabs act as a mechanical barrier and the termites cannot penetrate them.
   
Holes are drilled at the base of the
wall inside your premises
Pouring of insecticide in the holes

 

 

Check Up Visits:

After the initial major treatment, our operator will visit your premises for a check up once in every quarter. Necessary treatment will be carried out in case of any re-infestation. You can call us whenever there is a reappearance of termites during the contract period.
<< Back